What had been discreetly shared here and there has finally come to fruition. Since February 1, 2024, we can make use of our new assembly and test hall!
The past years were characterized by a closer collaboration with our clients, involving increasingly larger and more complex projects. While the people were in place, the building began to show signs of strain. To continue assisting our clients to the best of our ability, Nuutro embarked on the realization of a new test and assembly hall for the process installations it develops.
This hall boasts a floor area of 300 m2 with a height of 10 meters, of which approximately 9 meters are effective building height. To facilitate efficient construction, the hall is equipped with two overhead cranes, making it easy for our colleagues to build and position installations to precisely mimic the on-site conditions. A large 6×4 meter roller door enables us to produce skid modules with the maximum dimensions of a 40 ft high cube container, 12 meters long, and 2.7 meters high.
Furthermore, the entire sloping floor of this hall is fitted with a drainage channel and is equipped with complete utilities for compressed air, tap water, and hot water. This allows us to fully hydraulically test our installations after fabrication before sending them to our clients. This accelerates production time and avoids unnecessary pressure on the project site.
Finally, and perhaps the cherry on top, this hall will be equipped with various test equipment to support our clients in the conceptual phase with practical processing tests to mitigate risks early in the project. We can cool, heat, mix, dose, and connect third-party equipment to assess certain performances. This includes pressure drop tests, viscosity tests, product integrity tests, or determining heat conductivity. These factors are often unknown in new processes but are extremely important to understand before entering the basic design or execution phase.
In short: how does this development help you in projects?
During concept engineering:
• Determination of actual pressure drop values
• Determination of dynamic viscosity values
• Determination of heat conductivity values and actual heating or cooling curves
• Evaluation of product integrity with different production devices, such as maintaining structure.
• Evaluation of mixing, blending, and dissolving capabilities of different types of products and different types of mixing systems.
During execution:
• Skid construction up to approximately 200 m2 floor area
• Skid construction up to approximately 9 meters skid height, fully assembled
• FAT acceptance of the entire assembled production line
• Possibility of water tests and performance tests as part of the FAT acceptance.
Learn more about our project phases here: (intractief.nl)https://www.nuutro.nl/werkwijze/